Linde Engineering to build PEM electrolyser plant for Yara
The electrolyser plant will produce enough hydrogen to create 20 500 tpy of ammonia, which can be converted to between 60 000 and 80 000 t of green fertilizer.
The electrolyser plant will produce enough hydrogen to create 20 500 tpy of ammonia, which can be converted to between 60 000 and 80 000 t of green fertilizer.
Once completed, the plant will be a fully integrated, carbon-neutral facility, using solar and wind energy to produce 300 tpd of ammonia.
The agreement with Nitron represents approximately 25% of Agrimin’s planned sulfate of potash production capacity of 450 000 t.
The primary objective of the SE1 well (and any subsequent appraisal wells in South Erregulla) is to delineate approximately 350 PJs of high confidence resource in order to secure the gas requirements for Project Haber, Strike’s proposed 1.4 million tpy urea fertilizer manufacturing facility in Geraldton, Australia.
Fox River Resources Corp. has given an update on a preliminary economic assessment (PEA) study for the company’s 100% owned Martison phosphate project, located near Hearst, Ontario, Canada.
The company is to build a 60 000 tpy melamine plant in Gurun, Kedah, Malaysia.
The company has also been briefing potential offtake partners with the capability to procure all the planned Kola muriate of potash production.
The plants will be built in Dongping, Shandong Province, for a local urea producer.
Drilling has started at the first of two confirmatory holes located within the Ohmgebirge area of South Harz Potash's potash project in Germany.
Site-based work programmes for wet harvesting have been completed, confirming key design parameters including salt properties and cutting forces.
The construction schedule will see two 16 000 t UAN storage tanks completed first, with construction due to be completed in 2023.
Stamicarbon’s operator training simulator allows for training of plant operators on start-up and shutdown procedures, day-to-day plant operations and various scenarios in the plant.
The company has received approval to drill the second of two confirmatory holes at Ohmgebirge.
The plant in the Gopalpur Industrial Park will be equipped with advanced NOX/N2O abatement technologies.
Harvest Minerals is now working with Cemig (Companhia Energética de Minas Gerais S.A) - Minas Gerais state power company - to connect the solar plant to the power grid, which is expected to be completed in January/February 2022.