Skip to main content

Bedeschi to supply shiploader for Fertil Ruwais Terminal

Published by , Editorial Assistant
World Fertilizer,


For the Fertil Ruwais Terminal, Bedeschi will supply a shiploader for fertilizer and granulated urea to replace the existing one. The design capacity of the shiploader is 1.200 t/h and it will be delivered fully erected to site.

The machine will be running on rails, with a towed tripper to divert the product from a wharf gallery conveyor onto a transfer belt, then to a loading boom belt.

The tailor-made shiploader will be luffing and slewing to facilitate all loading operations required. The target is to set all the application and activities without interfere with operation activities of the terminal.

Design, engineering and construction for this machine are based on Bedeschi know-how, optimised and customised according to the client requirements. Specific design, characteristics and performances are developed and integrated jointly with client technical team.

Read the article online at: https://www.worldfertilizer.com/project-news/02082022/shiploader-for-fertilizer-and-granulated-urea-supplied-to-fertil-ruwais-terminal/

You might also like

Petrobras approves start of reactivation of fertilizer factory in Araucária

The Executive Board of Petrobras unanimously approved the initial measures for the revitalisation and future resumption of operations at the fertilizer factory Araucária Nitrogenados S/A – ANSA, a wholly-owned subsidiary of the company. The plant, located in Paraná, has been in hibernation since 2020. ?

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Urea news