Skip to main content

AMECO completes commissioning of portal reclaimer

Published by
World Fertilizer,


AMECO has announced that it has finished the commissioning of a fit-for-purpose portal reclaimer for a major global producer.

The portal reclaimer can handle 480 tph of urea with a rail span of 54 m at a nitrogen operations facility in Texas, US.

AMECO designed and supplied an innovative urea storage solution with a portal reclaimer capable of dragging urea up to 20 degrees below ground.

The portal reclaimer reportedly allows the facility to increase its storage capacity by 50% compared to other solutions.

Read the article online at: https://www.worldfertilizer.com/materials-handling/21092017/ameco-completes-commissioning-of-portal-reclaimer/

You might also like

Borealis and VERBUND are planning a joint green hydrogen project

The green hydrogen will be used to produce fertilizers, melamine and technical nitrogen at Borealis operations in Linz, Austria. The electrolysis plant is scheduled to commence operations in 2025, with projected annual CO2 emissions reductions of up to 90 000 t.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Urea news