Sulfuric acid supply to Conda phosphate business disrupted
The disruption in supply is a result of the smelter at Rio Tinto's Kennecott mine shutting down on 21 September 2021 following a release of molten copper materials.
The disruption in supply is a result of the smelter at Rio Tinto's Kennecott mine shutting down on 21 September 2021 following a release of molten copper materials.