Stamicarbon ships urea high pressure equipment for Volgafert
Published by Nicholas Woodroof,
Editor
World Fertilizer,
The pieces of equipment are a high pressure scrubber, a high pressure stripper and a pool reactor.
The project’s granulator has also been completed at Allgaier in Germany and is currently being shipped to Antwerp in three parts. The granulator will be packed at the port, collected by the client and transported via road to Tolyatti.
The last major piece of equipment for the project is the MMV scrubber, which is being manufactured by EnviroCare in the US.
Image courtesy of Stamicarbon.
Read the article online at: https://www.worldfertilizer.com/project-news/14072020/stamicarbon-ships-urea-high-pressure-equipment-for-volgafert/
You might also like
Global agriculture experts call for more responsible fertilizer practices to sustainably meet future food demand
A large group of global agriculture and food chain experts have called for greater collaboration across the fertilizer industry to ensure future food security for a growing global population while reducing agriculture’s impact on soils and the wider environment.