Bedeschi to supply shiploader for Fertil Ruwais Terminal
Published by Isabelle Keltie,
Editorial Assistant
World Fertilizer,
For the Fertil Ruwais Terminal, Bedeschi will supply a shiploader for fertilizer and granulated urea to replace the existing one. The design capacity of the shiploader is 1.200 t/h and it will be delivered fully erected to site.
The machine will be running on rails, with a towed tripper to divert the product from a wharf gallery conveyor onto a transfer belt, then to a loading boom belt.
The tailor-made shiploader will be luffing and slewing to facilitate all loading operations required. The target is to set all the application and activities without interfere with operation activities of the terminal.
Design, engineering and construction for this machine are based on Bedeschi know-how, optimised and customised according to the client requirements. Specific design, characteristics and performances are developed and integrated jointly with client technical team.
Read the article online at: https://www.worldfertilizer.com/materials-handling/02082022/shiploader-for-fertilizer-and-granulated-urea-supplied-to-fertil-ruwais-terminal/
You might also like
World Fertilizer Spotlight with IPCO
In this special Spotlight Interview, we talk to Robert Hermans, President and CEO of IPCO, as the company marks 125 years since the foundation of Sandvik Process Systems in 1901.